Longmont painter
Longmont handyman
Longmont windows
Longmont kitchen remodel
Longmont bathroom remodel
Longmont pest control
Longmont drywall
Longmont texture
Longmont doors installation
Longmont plumbing
Longmont Ceiling insulation
Longmont insulation
Boulder
All the below pictures are of the same home / job.

Customer lives out of state,  also use this page to show the
customer my progress.
More pictures to the right
Next few pictures are of the Town
Home.
Carpet is coming out.
Tile in Kitchen and front entry way is
coming out.
Two upstairs bathrooms, both same
size.
Carpet coming out, Tile going in.
Carpet, padding and carpet tack
removed

Tile removed
( For Customer )
Removed shower door frame
Cleaned up misc. and other area's
around shower / tub.
Rod and curtain hung
Concrete board laid on floor
New tile and grout.
Nice transition from carpet to tile.
New toilets
October
Removed shower wall and bath tub

Replaced with new tub and shower wall

Completed in 8 hours
Next few pictures are of the fire place being re tiled
Next few pictures are of the new
flooring
All tile removed
New tile
July 26th
Tile Job, three bathrooms
Removed carpet, added new tile with a boarder.
Third small bathroom not shown.
More pictures to the right
July 29th
Longmont
These roof vents needed the screens replaced.
Small birds had damaged the old screens
I removed each vent cap.
Shows some vents and
my work table
Every vent showed signs of damage
and small nest area
The new screen below is a metal
screen
Old screen was a soft mesh screen
All my bathroom tile jobs  I lay a
cement board on the floor
This is the fun part about being a handyman.

Budget Home Centers ( Vernetta ) had me stop by to see this customer.
The lady of the house was elderly and could no longer step over the tub to
take a shower, and did not have the funds for a tub remodel into a walk in
shower.
So... Desperate to be able to stay in her home.
I removed  the shower door
Cut the side of the tub out
Added concrete mortar
Hung a shower curtain

This is not my normal way I do work, but she needed help to stay in her home
of 30 years
Sept/ Oct. 2011
Converted a master bathroom into a wheel chair / handicap bathroom.

The floor is slopped to keep the water in the shower.
I forgot to get before pictures.
New vanity, counter top, toilet, grab bars, paint, lighting
New tile on walls and floor.
Oct. 2011

6 new windows installed

Added new trim around each window.
November 2011
Added two new vessel sink, drilled holes in the Granite Counter
top, hooked up all the plumbing in the cabinets.
3 hours, labor was $180.00