Gas Fireplace I  put in 2005
and I tiled  the wall and
floor also
I did not run the gas line.
Above / Old gate / side Fence
New Fence / Gate
12-14-07
This front porch is in Parker
You can see the boards are bad. I sprinkler head
was spraying on them.
Replaced three 6 x 6 post under the deck.
Replaced the main 16 x 1-1/2 stringer along the
front.
Had to jack up the porch due to it was pulling
away from the roof about 2"
Cost $560.00
Labor $450, $50 trip fee and $60 in materials.
12/14/07
This above job was in Frisco.
Had grout repair in a shower,
Bi-pass door adjustment in a bedroom.
One bedroom door would not latch.
The above window had a crack in the lower
sliding window.
The G.F.I. for the Hot Tub needed replaced.
Materials and labor $ 760.00
$450.00 for labor, $100.00 trip fee
This was a condo. My customer who owns it
lives in Niwot / Summerset
This page shows Misc. Jobs I've done over the years.

2007
Boulder
Wine Cellar.
16 ' x 16'
I removed the wood tile
flooring, added this
rubber mat that goes
together like puzzle
pieces
The wood floor got
wet. It took me 8 hours
just to removed the
glued wood tiles from
the concrete.
This is my year end / start of 2008 job in Boulder.
It's an attached green house.
All the metal racks are coming out. I'm building solid structure plant stands
and laying 6" tile on the walls and all the new plant stands / bench's
I will add new finished pictures later.
This is about a 5 or 6 weeks project.
See below new pictures half way threw project.
09 / 29 / 07
I put some metal hand rails up on a Duplex
$400.00 for labor and Materials.

The refrigerator use to be where the
door was is. The customer wanted the
refrigerator next to the pantry.
The picture to the right, the door way
was in front of where the ladder is
Look at the light switch on the wall.
2007
Window well cover I built. It's made out treated lumber.
You can walk on it. I do not recommend this for a fast exit from the
basement, it's weighs 200 lbs, it might weigh under 150 after the lumber
dries out.
Materials alone cost $150.00, one hour to build.
2007
This house is in North Longmont.
Added new railing. Added up by the
door and down below.
Took 4 hours to build both, prime and
paint.
Cost $400.00 in labor and materials.



.
Before
After
This is a Master bedroom in a House in Summerset / Niwot.
This opening goes into a sitting area they wanted closed off.
I'm standing in the master bedroom
There is a door to the haulway, they turned it into a small bedroom.
Same bedroom as above, they wanted a door going to the Master
Bedroom. We will put a window above the door someday.
I reused the old door jam and trim from the wall opening I closed in to
frame out this new door.
Same house as above. They wanted
an attic access door put in a walk in
closet.

I completed all three projects in 2 days.
Materials and labor came to $1150.00
Next 6 pictures / one house / job
01/04/08
Below pictures is what the new stands look like half way threw.
I've built the wood structure, added water proof board.
I still need to add tile to the stands and walls.
The area under the stands is all sand to hold humidity /
moisture. I also designed a way to get under the plant stands
for maintenance.  Notice in the center picture, the back comes
off.
May 2008 I built this
Front rail.
Materials and labor
was $300.00
This deck is in Westminster.
It was a remodel. The customer removed
the redwood decking.
I put on the Trex decking, skirting and
Railing.
Cost $1300.00 in Labor.
The 5 pictures show a closet door in
an old house, the walls where lath and
plaster.
I changed the opening to 48" and
added the bi-fold doors.
I also had to repair the floor where the
old wall was by adding some oak
planks the customer had.

Customer had the door.
Misc. Materials and labor came to
$525.00
Aug. 2008
I will be helping in adding a gas
fireplace behind this wall.
There was a real fireplace at one time,
it was removed.
On 08/31/08 I was At Honda of Longmont
This is one of there wash bay walls.
Water got behind the wall and did some
damage.
I removed the old fiberglass panel. Added
Durarock concrete board to the bottom, put
new fiberglass sheets up.
Materials and labor came to $950.00
Sept. 2008
Hung the French doors.
Sanded the dark spot on this floor.
Around the heat register