| Old gate / side Fence I did this years ago. |
| New Fence / Gate |
| This page shows Misc. Jobs I've done over the years. It's hard for me to keep it organized |
| 2008 job in Boulder. It's an attached green house. All the metal racks above are coming out. I'm building solid structure plant stands and laying 6" tile on the walls and all the new plant stands / bench's I will add new finished pictures below. This is about a 5 or 6 weeks project. |
| 09 / 29 / 07 I put some metal hand rails up on a Duplex $400.00 for labor and Materials. |
| 2007 Window well cover I built. It's made out treated lumber. You can walk on it. I do not recommend this for a fast exit from the basement, it's weighs 200 lbs, it might weigh under 150 after the lumber dries out. Materials alone cost $150.00, one hour to build. |
| 2007 This house is in North Longmont. Added new railing. Added up by the door and down below. Took 4 hours to build both, prime and paint. Cost $400.00 in labor and materials. . |
| Before |
| After |
| This is a Master bedroom in a House in Summerset / Niwot. This opening goes into a sitting area they wanted closed off. I'm standing in the master bedroom There is a door to the haulway, they turned it into a small bedroom. |
| Same bedroom as above, they wanted a door going to the Master Bedroom. We will put a window above the door someday. I reused the old door jam and trim from the wall opening I closed in to frame out this new door. |
| Same house as above. They wanted an attic access door put in a walk in closet. I completed all three projects in 2 days. Materials and labor came to $1150.00 |
| Next 6 pictures / one house / job |
| 01/04/08 Below pictures is what the new stands look like half way threw. I've built the wood structure, added water proof board. I still need to add tile to the stands and walls. The area under the stands is all sand to hold humidity / moisture. I also designed a way to get under the plant stands for maintenance. Notice in the center picture, the back of the shelve comes off. |
| May 2008 I built this Front rail. Materials and labor was $300.00 0 |
| This deck is in Westminster. It was a remodel. The customer removed the redwood decking. I put on the Trex decking, skirting and Railing. Cost $1300.00 in Labor. |
| On 08/31/08 I was At Honda of Longmont This is one of there wash bay walls. Water got behind the wall and did some damage. put new fiberglass sheets up. Materials and labor came to $950.00 |
| 10/08 This was a deck remodel out of town. The frame was not touched New composite material $4900 labor and materials. Size was about 25' long x 11' wide |
| 2008 This Job was in Erie. Commercial office space. They needed a Conference room. So I built a wall, filled in a door way, added a door. I did some other misc. things in another room. Materials came to $980.00, Labor was $2000.00 Finished in 5 days. |
| Fence repair on Nelson Road. 8 new post. hand dug 8 new holes Put old wings back up. Labor was $450.00 Customer purchased new 4x4x8 and concrete. I supplied the labor. The Temperature in the morning was 7 above zero Started at 8:00am, finished at 3:00pm Did not stop for lunch. |
| 02 / 09 Below is a Humidifier I hung 6 of these at Premier Manufacturing. I did not hook up the power or water. Cost $600.00 to hang them. $390.00 in labor, rest of the money was ceiling supports / materials |
| 05/09 Longmont Power washed and stained all of deck, even under side Materials they bought labor $450.00 |
| With this product, you pick the color just like you would if it was paint Sherwin Williams can make this any color you want |
| 06/09 Pratt St. Longmont New Awning, shutters, mail box, house numbers, Porch Light Kitchen light fixture, toilet paper holder, towel holder. $250.00 for labor. My camera was on the wrong setting, fuzzy pictures |
| 2010 The brick was to have drywall put over it. I also built a wood 1/2 wall by the stairs |
| Several area's I had to do drywall ceiling repair, this is only one area Upstairs unit cloths washer had a water malfunction and got into the ceiling. |
| After |
| Before |
| Above is before Below is after |
| More pictures to the right |
| More pictures to the right |
| More pictures to the right |
| More pictures to the right |
| More pictures to the right |
| More pictures to the right |
| Longmont painter Longmont handyman Longmont windows Longmont kitchen remodel Longmont bathroom remodel Longmont pest control Longmont drywall Longmont texture Longmont doors installation Longmont plumbing Longmont Ceiling insulation Longmont insulation Loews Lowe's Home Depot Budget Home Centers |
| Boulder Customer wanted a window seat built with storage Labor was $475.00 Materials cost around $100.00 |